Hey gang!
After fighting with wood chips and recently a case of bumblefoot, we decided we are going to scrape out our run, and:
-Drop a 6” layer of gravel (7/8” washed gravel) for drainage on the base)
-Drop a 8-12” layer of sand on top!
Before I take a run to the local bark/gravel supply yard, my wife and I thought it’d be prudent to post the products here we are going to be using as a last ditch, “is this right?” post
Pictures attached of the 7/8” washed gravel for the drainage base layer, although for the top sand layer we are torn between the Coarse Builder’s Sand or the 5/8 Minus Crushed for the top sand layer.
What would you guys use?! We are leaning towards the Coarse Builder’s Sand..
After fighting with wood chips and recently a case of bumblefoot, we decided we are going to scrape out our run, and:
-Drop a 6” layer of gravel (7/8” washed gravel) for drainage on the base)
-Drop a 8-12” layer of sand on top!
Before I take a run to the local bark/gravel supply yard, my wife and I thought it’d be prudent to post the products here we are going to be using as a last ditch, “is this right?” post

Pictures attached of the 7/8” washed gravel for the drainage base layer, although for the top sand layer we are torn between the Coarse Builder’s Sand or the 5/8 Minus Crushed for the top sand layer.
What would you guys use?! We are leaning towards the Coarse Builder’s Sand..